With the one-year countdown beginning today for the federal enforcement of REAL ID for commercial domestic air travel and other…
Northbound Rehabilitation Underway With construction of the southbound side of the U.S. 1 (Roosevelt Expressway) viaduct over SEPTA and the…
Southbound Right Lane Paving Nearing Completion Paving operations on the southbound right lane of the U.S. 1/Roosevelt Expressway viaduct over…
Paving this Fall on Viaduct’s Southbound Right Lane Rehabilitation continues on the U.S. 1/Roosevelt Expressway viaduct over SEPTA and the…
Statewide Online Survey Available Until October 26 Harrisburg, PA – The Pennsylvania Department of Transportation (PennDOT) is accepting construction and maintenance…
Stage Three Construction Begins This Summer Rehabilitation of the southbound left lane of the U.S. 1/Roosevelt Expressway viaduct over SEPTA…
The Pennsylvania Department of Transportation (PennDOT) announced today the posting of Variable Speed Limits (VSL) and Queue Detection and Warning…
After testing period, VSL signs to reflect real-time conditions beginning May 10 Conshohocken, PA – PennDOT Secretary Yassmin Gramian was joined…
Rehabilitation Continues on Southbound U.S. 1 Viaduct March 26, 2021 – Rehabilitation of the southbound left lane of the U.S. 1/Roosevelt Expressway…
Commercial product extensions set to expire March 31, 2021 Harrisburg, PA – The Pennsylvania Department of Transportation (PennDOT) announced today that…